{"id":7911,"date":"2025-07-22T12:21:47","date_gmt":"2025-07-22T12:21:47","guid":{"rendered":"https:\/\/assetphysics.com\/?p=7911"},"modified":"2025-07-22T12:22:52","modified_gmt":"2025-07-22T12:22:52","slug":"acquisition-of-hoegh-evi","status":"publish","type":"post","link":"https:\/\/assetphysics.com\/de\/acquisition-of-hoegh-evi\/","title":{"rendered":"Acquisition of Hoegh EVI"},"content":{"rendered":"\n\t<section class=\"snk-section snk-section_xs\" >\n\t\t<div class=\"container container-xs\">\n\n\t\t\t\n\n\t\t\t\n\t\t\t\t<div class=\"row snk-textColumns\">\n\t\t\t\t\t\n\t\t\t\t\t\t<div class=\"col col-12 snk-textColumn\">\n\t\t\t\t\t\t\t<div class=\"snk-textBlock\">\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<h3>Acquisition of Hoegh EVI<\/h3>\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p>On 30 April 2025 Igneo formally acquired a 50% stake in the Norway headquartered, Floating Storage Regasification Unit (FRSU) operator Hoegh EVI.<\/p>\n<p>In the NEWSFLASH episode of Keeping it Real Assets Alex Nassuphis provides his thoughts on the role FSRUs and market leader Hoegh Evi are expected to play in the provision of long-term energy supplies.<\/p>\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\n\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t<\/div>\n\t<\/section>\n\n\n\n\t<section class=\"snk-section snk-section_noPadding\">\n\t\t<div class=\"container container-xs\">\n\t\t\t<div class=\"snk-media snk-media_video\">\n\n\t\t\t\t\t\t\t\t\t<div class=\"snk-media-embed\"><iframe title=\"Spotify Embed: Acquisition of H\u00f6egh Evi\" style=\"border-radius: 12px\" width=\"100%\" height=\"152\" frameborder=\"0\" allowfullscreen allow=\"autoplay; clipboard-write; encrypted-media; fullscreen; picture-in-picture\" loading=\"lazy\" src=\"https:\/\/open.spotify.com\/embed\/episode\/1kJmloNe8uuTeDTopnpEmo?si=G9btmCZbT2ydkkg8tzS1qw&amp;utm_source=oembed\"><\/iframe><\/div>\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t<\/section>\n\t\n\n<section class=\"snk-section snk-section_xs\">\n\t<div class=\"container container-xs snk-testimonial-container\">\t<div class=\"row\">\n\t\t<div class=\"snk-testimonial\">\n\t\t\t<div class=\"snk-testimonial-inner\">\n\t\t\t\t<div class=\"snk-testimonial-content-wrapper\">\n\t\t\t\t\t<div class=\"snk-testimonial-content\">\n\t\t\t\t\t\t<figure class=\"snk-testimonial-quote\">\n\t\t\t\t\t\t\t<blockquote><p>\r\nBarriers to entry in the sector are very high. From a capital investment standpoint, a new-build FSRU costs over $400 million, while a conversion from an LNG carrier to an FSRU costs more than $200 million, on top of the value of the ship being converted.\r\n<\/p><\/blockquote>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\t\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\t","protected":false},"excerpt":{"rendered":"<p>On 30 April 2025 Igneo formally acquired a 50% stake in the Norway headquartered, Floating Storage Regasification Unit (FRSU) operator Hoegh EVI.<\/p>\n","protected":false},"author":37,"featured_media":7913,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_co_authors":[],"footnotes":""},"categories":[8,23],"tags":[],"type_content":[30],"class_list":["post-7911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure","category-deals","type_content-podcast"],"acf":{"homepage_featured_article":false},"_links":{"self":[{"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/posts\/7911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/comments?post=7911"}],"version-history":[{"count":1,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/posts\/7911\/revisions"}],"predecessor-version":[{"id":7916,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/posts\/7911\/revisions\/7916"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/media\/7913"}],"wp:attachment":[{"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/media?parent=7911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/categories?post=7911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/tags?post=7911"},{"taxonomy":"type_content","embeddable":true,"href":"https:\/\/assetphysics.com\/de\/wp-json\/wp\/v2\/type_content?post=7911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}