Data centres are becoming increasingly important as part of the digital infrastructure. As the demand for computing power rises – particularly due to artificial intelligence and cloud applications – so too does the interest in data centres as a distinct asset class. At the same time, these specialised properties present particular challenges for investors, financial institutions and valuers. 

Unlike traditional commercial property, the value of a data centre does not depend solely on location, the physical condition of the building and tenancy agreements. The availability and capacity of the energy supply, the technical infrastructure, operational concepts and the long-term usability of the infrastructure are also crucial factors.

Energy supply is becoming a decisive location factor

The availability of sufficient electricity capacity is one of the key prerequisites for the development and operation of data centres. The extent to which the electricity supply influences the value of a location is already evident in land prices. In established data centre clusters such as Frankfurt/Rhine-Main or Berlin/Brandenburg, prices of up to 3,000 euros per square metre are paid for plots with planning permission and a secure electricity supply – in some cases even more. In less sought-after locations, however, prices may be on a par with those of ordinary commercial and industrial plots.

For investors, this means they must examine more closely, even before purchasing, which technical requirements a site meets. This is not just a question of currently available capacity, but also of whether capacity can be expanded in the future. After all, as the demand for computing power rises, so too do the demands placed on the infrastructure.

Technological progress becomes a valuation risk

The specific characteristics of this asset class are also evident in construction costs. According to the HypZert study ‘Datacentres: Insights into a New Asset Class’, over 30 per cent of construction and implementation costs are attributable to electrical engineering, with a further 20 per cent or so going towards air-conditioning systems. Together, these two areas thus account for around half of the costs.

This has significant implications for valuation. This is because technical systems age more quickly than the building itself. Rising power densities, new cooling concepts and higher energy efficiency requirements may necessitate substantial additional investment. A data centre may be in excellent structural condition yet still reach its technical limits.

It is therefore crucial for the valuation to determine how long the existing infrastructure can be used economically and what investments will be necessary to keep it competitive. Particularly with long-term leases, there is a risk that stable income may mask a significant need for modernisation.

The valuation must look beyond the building itself

For investors and financial institutions, it is therefore essential not only to consider a data centre’s current returns but also the long-term performance capability of its infrastructure. Traditional valuation methods remain the foundation for this. However, they must take appropriate account of the technical risks and future investment requirements.

Whilst a secure electricity supply can significantly enhance a site’s value, outdated technology can considerably reduce the value of an existing data centre. Anyone wishing to assess data centres reliably must therefore also be able to evaluate how future-proof their technical infrastructure is.

Further information can be found in the HypZert study: Data Centres – Insights into a New Asset Class  