This article is translated automatically.

News

Light:Guard shuts down first wind farm in Austria using BNK

Light:Guard GmbH and Windkraft Simonsfeld AG have successfully launched a pilot project for demand-driven night-time marking (BNK) in Austria. The light:guard system was activated this month at the Dürnkrut III wind farm. This makes it Light:Guard’s first active BNK system in Austria.

BNK reduces the flashing of wind turbines to a minimum. To do this, the system monitors the airspace around a wind farm. If an aircraft approaches, it cancels the suppression of the lighting and the red light flashes as before. In Germany, the use of BNK has been mandatory since last year, whilst in Austria it remains voluntary for existing installations. For new wind farms, however, BNK is generally required by the authorities. Windkraft Simonsfeld has, however, made a conscious decision to retrofit all its wind farms currently in operation.

The legal basis in Austria is Section 123a of the LFG. The aim is the same as in Germany: to reduce light emissions whilst maintaining full aviation safety. However, the way it works is different. The BNK signals to override the suppression of the lighting do not come from the BNK provider, but are sent centrally from Austro Control to the wind farm. The BNK system installed there then controls the lights on the wind turbines.

The Dürnkrut III wind farm, owned by Windkraft Simonsfeld AG, has been in operation since 2023 and comprises three Nordex turbines with a total rated capacity of 17.1 MW. It generates enough clean electricity each year to power 12,400 households. As this is an existing wind farm, the installation of BNK equipment was voluntary.

“Wind power is a key component of our energy future. At the same time, it is important to us to minimise the impact of our turbines on people and the environment as much as possible. The wind industry has long been calling for needs-based night-time lighting. Now we can implement this, thereby reducing unnecessary light pollution and responding to a frequently expressed wish from the public,” says Markus Winter, Chief Technical Officer at Windkraft Simonsfeld.

Felix Freiherr von Hammerstein, Head of Sales at Light:Guard, is also pleased with the pilot project: “The use of BNK to reduce the flashing of wind turbines has become a key issue in terms of public acceptance. Austro Control has now made it possible to implement this throughout Austria. As a system integrator, Light:Guard ensures that the Austro Control signal is reliably received at the wind farm and that the flashing lights are suppressed. We have now successfully demonstrated this at the Dürnkrut III wind farm. We would like to thank Windkraft Simonsfeld for their excellent cooperation on this pioneering project. We hope that, for the benefit of the rest of Austria’s local residents, further wind farms and operators will follow their example.”

#Newsletter: Stay up to date!

Sign up for our newsletter and receive regular updates on the latest topics.

Register now