ENOVA takes stock of the situation: 1.4 GW in in-house operation, around 400 MW in implementation with 14 wind farms; all EEG tenders successful. An additional 200 MW bought, Meppen (65 MW) and Gehrde (12.6 MW) in operation. Target by 2030: 3 GW of stock and 5 billion euros of AuM.