MLK Gruppe

Company posts

BU: v.l.n.r. Gottfried Hack (Ortsbürgermeister Scheid), Heinrich Lohmann (Geschäftsführer MLK), Monika Seifen (Vorständin eegon), Martin Pütz (Vorstand eegon) und Kevin Schröder (Leiter Regionalbüro MLK Gruppe) eröffnen den Windpark mit dem symbolischen Startknopf.
© MLK | Felix Bullik

Opening of the repowered Scheid wind farm: MLK Group and eegon celebrate together with local citizens

MLK Group and the eegon Eifel Energy Cooperative opened the repowered Scheid wind farm in the Volcanic Eifel region on 10 June. Two Nordex N163 turbines in the 7 MW class are connected to the grid, with an output of 14 MW. The focus is on citizen participation; further expansion is planned.

Local value creation and nationwide participation: MLK Group further expands citizen participation

The MLK Group is expanding financial citizen participation in wind energy projects. Subordinated loans offer a fixed interest rate, but carry the risk of total loss; first for residents, at the same time nationwide via a digital platform with current offers in Korschenbroich and Kückhoven.